Posted by:
rainbowsrus
at Wed Mar 13 21:59:24 2013 [ Report Abuse ] [ Email Message ] [ Show All Posts by rainbowsrus ]
Not exactly at the same time, did both upstairs at the same time with piping and electrical left temporarily connected in the open wall of the laundry room underneath. Once those two were done back to functional took out the downstairs, finished the upstairs wiring to the electrical panel and now finishing up the repipe to copper. Next will be wiring the third bathroom, button up the walls and build that one back to functional. All three done in natural stone and all three different. Will post up some pics when done. The girls are now both off to college, exactly why we waited this long. ----- Thanks,
Dave Colling
![](http://gallery.pethobbyist.com/data/77356logo_test_2.jpg) www.rainbows-r-us-reptiles.com
0.1 Wife (WC and still very fiesty) 0.2 kids (CBB, a big part of our selective breeding program)
LOL, to many snakes to list, last count (02/01/2010): 42.61 BRB 27.40 BCI And those are only the breeders ![](images/smiles/teeth.gif)
lots.lots.lots feeder mice and rats ![](images/smiles/wink.gif) ![](images/smiles/smile.gif) ![](images/smiles/wink.gif)
[ Reply To This Message ] [ Subscribe to this Thread ] [ Show Entire Thread ]
|