Posted by:
Bighurt
at Sat Oct 30 16:25:20 2010 [ Email Message ] [ Show All Posts by Bighurt ]
Just an update, I'm still trying to track down a local source for 3M fastbond, seems to be the most suited product for this situation.
One thing to note; the cost to frame, sheet, and insulate both structures; either via stick built or SIP built is nearly identical in costs. The SIP built using DIY SIP's are definitely the longer route. However their is no question at being lighter than stick built.
After review of my calculations it appears I had some decimal point errors. Re factoring weight and cost of the buildings yields the following;
SIP $1870.63 at a weight of 6019lbs Stick built $2016.97 at a weight of 8570lbs
So while not as dramatic as I once though it is still over a ton lighter.
Although not exact as I'm using figures used in a school project from the turn of the century.
I'm not sure this will come to fruition, but the concept is interesting.
I'm still considering HVAC and plumbing issues with a remote facility. As the design is semi-permanent, this limits plumbing and electrical connections. Meaning the facility will not be connected to a water supply. And the electrical supply will have limited amp capability. ----- Jeremy Payne JB Reptile