return to main index

  mobile - desktop
follow us on facebook follow us on twitter follow us on YouTube link to us on LinkedIn
Southwestern Center for Herpetological Research  
Click for 65% off Shipping with Reptiles 2 You
Locate a business by name: click to list your business
search the classifieds. buy an account
events by zip code list an event
Search the forums             Search in:
News & Events: How a python change the course of Attenbourgh's life . . . . . . . . . .  Make good choices . . . . . . . . . .  Burmese found on roadside in Wisconsin raises issues . . . . . . . . . .  Short interview with Bryan Suson of Sundown Reptiles . . . . . . . . . .  Happy Earth Day . . . . . . . . . .  Kingsnake Merch Store . . . . . . . . . .  Kingsnake returns to Tinley . . . . . . . . . .  kingsnake.com joins Monitor Brains! . . . . . . . . . .  Sneak Peek . . . . . . . . . .  Amphibian gut bacteria showing promise in cancer research . . . . . . . . . .  Herp Photo of the Day . . . . . . . . . .  Herp Photo of the Day . . . . . . . . . .  Meet The Baroness - The world's longest snake . . . . . . . . . .  Herp Photo of the Day . . . . . . . . . .  Updates? . . . . . . . . . .  Herp Photo of the Day . . . . . . . . . .  The mechanics behind the viper strike . . . . . . . . . .  Snakes on a Train? . . . . . . . . . .  Tracking the animals in the Florida Everglades - Meet the Croc Docs . . . . . . . . . .  Reintroduction attempts give San Francisco Garter a second chance . . . . . . . . . .  Promoting Reptiles is Our Jam Man . . . . . . . . . .  Origins of Chytrid discovered . . . . . . . . . .  Wisdom Wednesday - The Forums - The water is warm... Come on in! . . . . . . . . . .  Kingsnake.com Past, Present and Future . . . . . . . . . .  IHS Celebrates 50 years . . . . . . . . . .  End of January 2026 . . . . . . . . . .  Fun Fact Friday - Green Tree Monitor . . . . . . . . . .  The Evolution of the Osteoderm discovered . . . . . . . . . .  PACNWRS Expo Jan 2026 . . . . . . . . . .  Diamondback discovered in new Texas county for first time . . . . . . . . . .  CRE - May 16-17, 2026 . . . . . . . . . .  Colorado Herp Society Meeting - May 16, 2026 . . . . . . . . . .  Chicago Herpetological Society Meeting - May 17, 2026 . . . . . . . . . .  Bay Area Herpetological Society Meeting - May 22, 2026 . . . . . . . . . .  DFW Herp Society Meeting - May 23, 2026 . . . . . . . . . .  Tucson Herpetological Society Meeting - May 25, 2026 . . . . . . . . . .  Greater Cincinnati Herp Society Meeting - June 03, 2026 . . . . . . . . . .  CRE - Jun. 20-21, 2026 . . . . . . . . . .  Colorado Herp Society Meeting - June 20, 2026 . . . . . . . . . .  Chicago Herpetological Society Meeting - June 21, 2026 . . . . . . . . . . 

Building a Rat Rack.. *LOTS OF PICS*

[ Login ] [ User Prefs ] [ Search Forums ] [ Back to Main Page ] [ Back to Feeder Food Discussion ]

Posted by: sartori at Fri Nov 7 22:07:08 2003   [ Email Message ] [ Show All Posts by sartori ]  
   

I sure hope i got all these pics linked right



Rat Rack Building Instructions -



Below I will go over the instructions and steps needed to build and install a fully functional 5 level, 10 tub rat breeding rack.



Tools you will require to complete the job (or something similar) -



- Saw (i use a miter saw)

- cordless screwdriver/drill

- 1 staple gun/hand stapler

- hammer

- wire cutters (for cutting hardware cloth)



Building Materials you will require -



- 10 "large" cement mixing tubs (28X19X6"

- 1 box 1 5/8" screws

- 2' of 1/2" PVC pipe

- 2- 2'X 2' 1/4" hardboard pieces

- 1 box 2" screws

- 1 roll of 1/2" hardware cloth

- 15 1X3X8' boards

- 4 caster wheels (full rotation)

- 16 1.5" bolts, nuts and washers (for attaching wheels)





Lets get started.



Building the Frame -



In order to build the basic frame, we will need to cut 5 pieces of wood. We need 2 boards at 41.75", and 3 boards at 28". These will



screw together to form the basic frame. Pre-drill and screw the frame together using the 1 5/8" screws as its pictured below. Once the



outside frame is screwed together, measure 20.5" from both ends and make a mark, this will tell you where your middle support should be



placed.











Now, roll out your hardware cloth onto the frame, and cut it to fit. Use your stapler, to fasten it down to the frame itself. When



completed it should look something like below.











Building the slide assembly -



Now you have your basic frame all assembled, now we need to complete the tub slides. I tried many diffrent options, using wood cut for



depth, using screws set as stops for the depth. But by far the easiest method for setting up your tub slides is to use 1/2" PVC pipe.



You will need to cut, 45 little pieces of the 1/2" pipe to a length of 3/4". This allows you to attach the slide material with a screw



right down the length of the pipe, using it as a "bushing" for the correct depth.



You will also need to get your 2'x2'x1/4"deep hardboard out at this time. You will need to cut the hardboard into 2 diffrent widths.



The first is the "outer" tub slides which measure 1-5/8" wide. You will need to cut 10 of this size. Cut them and set them aside.



You will also need to cut your "inner" tub slides as well. These measure 2-3/4" in width. You will need to cut 5 of these and set them



aside.



Below shows you a close up of how the slides and spacers are attached to the frame. You predrill a hole thru the hardboard, and drive a



2" screw thru the middle of the spacer and into the frame rail.













Now i bet ur asking yourself "these slides are 24" long, while the frame is 28" long. This is for something which will make sense later



in the installation. This allows the tubs to drop out of the way of the installed AUTOMATIC watering system. Below is a picture of



the completed "slides" on both sides and the middle.











You have now completed 1 full level. Go ahead and complete the other 4 levels the exact same way.





Attaching The Legs & Wheels -



Now cut 4 of the remaining 1X3X8' boards to a length of 60". These will become the "legs" for the rack system. You need to allow 9" between the top of one level, and the bottom of the next, this allows proper spacing for the tub to slide out, and not have it bump into the later installed automatic watering system. Attach all 4 legs. Measure and cut 2 more boards at 41.75" for the "wheel supports". Screw them into the bottom of the legs. This is where you will attach your 4 wheels.









You can now build the optional "feed bins" if you so wish. They are built simply out of 1 board which is 19.75" and 2 which are 6". This screws together to form an area to hold all your feed for longer times between feedings.







The rack is basically completed at this point. You can fasten some type of "stop" at the back of each tub (screwed to the frame) to prevent the rats from pushing the tub out the back of the rack.















Just add rats



Email me if you have any questions, or if i screwed something up while writing and takin pictures... im almost sure i did! (plus.. i can take more pics if people need them.. )


   

[ Hide Replies ]


>> Next topic:  Care Sheets for keeping Cix? - Jose J., Sat Nov 8 01:20:19 2003
<< Previous topic:  Breeding Ghost Shrimp - herpfood, Fri Nov 7 17:23:47 2003

Click for 65% off Shipping with Reptiles 2 You Click to visit Sierra Fish and Pets Click to visit Classifieds
KINGSNAKE.COM

Enjoy all our content free of charge with a user account that gives you full access to every feature. For added visibility, paid options are available - post in our Classifieds, showcase your business with Banner Ads or a Directory listing, promote reptile events, and more.

Quick Links
Community
Legal & Safety
Support

Register for free ✓ Sign up!

Kingsnake.com ® is a registered trademark © 1997-