Well the electrical is all ran now. The sheet rock is all hung. I have 4 plugins at the top of the wall, and the bottom of the wall every 4 feet. The sheet rock is a new stuff called purple board. It's supossed to be water and mildew resistant. There is insulation floor ceiling and all the walls. That got hung today before the sheet rock. Plenty left to do though. Sheet rock has to be taped and muded. Then i have to paint all of that. Plumbing still has to be ran for my hopper sink. The city has to come out and run electricity from my house to the building. Heat and air has to go in. The floor has to be tiled. Lights all put up. And im having 8'X 3' cages built 4 high floor to ceiling for my big snakes. And a small walk in incubator in one corner. So as you can see its a long way from finished. But here are pics of what was done today. Also sorry for bad picture quality, just a walmart digital camera and im not Steve Gooch.

-----
kevin
36 pythons and boas and 4 lizards