>>Hey how do you put the sliding glass door tracks on.
I attach them to the lip with Liquid Nails.
>>Do you run the Substrate Dam on the outside or the inside of the cage?
That depends. If I'm building a separate face frame from real wood stock I attach it directly to the front of the cage, therby covering the exposed, cut edges of the laminated plywood.
If I'm using cut strips of plywood for the lips/substrate dams they run between the sides on the inside of the cage.
They I cover the cut plywood edges with edge tape or some moulding.
>>How do you measure the Glass for the door.
For the glass track I've used I believe it was 7/16" less than the rough opening of the cage. Some products vary.
By rough opening I mean the distance between the upper and lower lips BEFORE the track is attached.
Again, you'll need to check with the instructions on whatever product you buy.
-----
Current snakes:
0.2 Gonyosoma oxycephala - (Silver/Yellow)
3.3 Gonyosoma oxycephala - (Green)
2.1 Gonyosoma janseni - (Black)
3.3 Gonyosoma janseni - (Black & Tan)