mobile - desktop |
3 months for $50.00 |
News & Events:
|
|
[ Login ] [ User Prefs ]
[ Search Forums ] [ Back to Main Page ] [ Back to Rainbow Boas ] [ Reply To This Message ] [ Register to Post ] |
Posted by: rainbowsrus at Wed Mar 13 21:59:24 2013 [ Report Abuse ] [ Email Message ] [ Show All Posts by rainbowsrus ] Not exactly at the same time, did both upstairs at the same time with piping and electrical left temporarily connected in the open wall of the laundry room underneath. Once those two were done back to functional took out the downstairs, finished the upstairs wiring to the electrical panel and now finishing up the repipe to copper. Next will be wiring the third bathroom, button up the walls and build that one back to functional. All three done in natural stone and all three different. Will post up some pics when done. The girls are now both off to college, exactly why we waited this long. [ Reply To This Message ] [ Subscribe to this Thread ] [ Show Entire Thread ] | ||
<< Previous Message: RE: Shhh, I was napping..... - waspinator421, Wed Mar 13 21:17:36 2013 |
AprilFirstBioEngineering | GunHobbyist.com | GunShowGuide.com | GunShows.mobi | GunBusinessGuide.com | club kingsnake | live stage magazine
|